Pacific Fleet Sub Drive-In MSF, Project P-587

Beckoning Point, Pearl Harbor, Hawaii

  • A new 213-meter (700-foot) non-magnetic concrete slip, installation of x-, y-, and z-loop cables, electrical Rectifier Building, and other improvements.
  • Over water soil borings to depth of over 150 feet below water table.
  • Assisted in update of 1391 and during preparation of design and Design-Build Request for Proposal documents.
  • Currently providing consultation during construction.
  • Geotechnical feedback helped in siting of finger piers to more favorable subsurface conditions.