A new 213-meter (700-foot) non-magnetic concrete slip, installation of x-, y-, and z-loop cables, electrical Rectifier Building, and other improvements.
Over water soil borings to depth of over 150 feet below water table.
Assisted in update of 1391 and during preparation of design and Design-Build Request for Proposal documents.
Currently providing consultation during construction.
Geotechnical feedback helped in siting of finger piers to more favorable subsurface conditions.